Scope Overview
Every commercial concrete pour has an MEP dependency hiding somewhere underneath it - under-slab plumbing that has to be roughed in and pressure-tested before we pour, electrical conduit that needs to be sleeved through footings, floor drains and trench drains that have to land at the right elevation for the slab to drain correctly. We coordinate the concrete side of mechanical, electrical, and plumbing rough-in work across Denton, acting as the point of contact between the MEP trades and the concrete schedule so nobody's cutting into a cured slab to fix a rough-in that got missed.
That means walking the site before a pour to verify every under-slab penetration is sleeved and located per the coordinated drawings, holding the pour if an MEP inspection hasn't cleared yet, and building embed schedules for electrical conduit, plumbing stub-outs, and equipment anchor bolts directly into our reinforcement layout. On tenant improvement and fit-out projects, where MEP work often gets added or changed after the shell is already built, we core-drill and patch existing slabs to add new rough-ins without compromising structural capacity, which takes different technique than a fresh pour.
We don't hold an MEP license and don't install mechanical, electrical, or plumbing systems - we handle the concrete work those trades depend on, and we run tight enough coordination that a pour date doesn't slip because a plumber's rough-in inspection got scheduled late.